+30 210 60 22 024   |   info@thelcon.gr   |

NIKAS

Project Information

Energy audits for the leading cold-cuts industry NIKAS in Aghios Stefanos.
The company operates various production lines producing thousands of tons worth of products annually.

At NIKAS facilities (estimated total area 12.000 m2 ) Thelcon conducted:

  • Recording, analysis & break-down of energy consumption
  • Recording and analysis of electromechanical equipment
  • Analysis of the products production process
  • Calculation of energy indicators, baselines and KPI’s
  • Energy conservation proposals with thorough financial documentation (LCCA )

The proposed energy conservation measures included:

  • Improved control and operation of the cooling system & pipeline network
  • Heat recovery from steam boilers
  • Improvement of the facility’s lighting
  • Energy metering and recording system
  • Client NIKAS
  • Category Energy Design
  • Location Athens
  • Year 2018 - 2019