+30 210 60 22 024   |   info@thelcon.gr   |

OAKA – Energy Upgrade

Project Information

Participation in the Energy Upgrade of E/M Systems at the Olympic Athletic Center of Athens (OAKA) – focused on optimizing functionality and energy efficiency for the iconic venues of the 2004 Olympic Games.

  • BEMS Upgrade: Replacement of fragmented control systems with a unified, modern Building Energy Management System (BEMS).
  • Energy Monitoring: Installation of the Thelsoft energy platform to record and analyze energy consumption.

The project includes:

  • Central Olympic Stadium
  • Indoor and outdoor swimming pools
  • Velodrome
  • New Combined Heat and Power (CHP) System for electricity, heating, and cooling production

 

The new central control and monitoring system integrates lighting, heating, air conditioning, ventilation, shading, and other E/M systems, providing centralized management of the facilities and ensuring high energy efficiency at OAKA.

Project in collaboration with Metlen Energy & Metals.

 

  • Client METLEN Energy & Metals
  • Category BEMS
  • Location Athens
  • Year 2024 - 2025